The estimating library
Find the next useful answer.
A tool for the calculation, a guide for the workflow, and worked examples that explain the assumptions. Start with the decision in front of you.
Follow a decision from question to numbers
- Set a price. Build the cost basis → check margin → test a discount.
- Make a delivery promise. Connect the tasks → check capacity → test the deadline.
- Review a bid. Review assumptions → name the reserve → check funding.
All resources (57)
57 resources. All links work without JavaScript.
- Calculator
PERT estimate calculator
Turn an optimistic, most likely and pessimistic estimate into a mean and approximate P50/P80/P90.
- Calculator
Fixed-price project calculator
Check loss probability and the margin a three-point cost estimate supports.
- Calculator
Project break-even calculator
Combine fixed costs, daily burn and uncertain duration to check the break-even price.
- Calculator
Cost overrun probability calculator
Estimate the chance your project cost exceeds a budget using a normal approximation.
- Calculator
Deadline confidence calculator
Check the chance of finishing within an elapsed-day deadline from one duration range.
- Calculator
Project bid price calculator
Find a quote from a three-point cost range, target margin and planning confidence.
- Calculator
Margin & markup calculator
Calculate gross margin, markup, profit and the price needed for a target margin. See why a 25% markup is only a 20% margin. Free, no signup.
- Calculator
Freelance hourly rate calculator
Find an hourly rate from annual compensation, overhead, billable utilization and target margin. Includes a worked example and downloadable decision brief.
- Calculator
Discount impact calculator
See how a client discount changes project profit and gross margin. Calculate the maximum discount that preserves your target margin at the entered cost.
- Calculator
Scope creep & change fee calculator
Price additional project hours and direct costs, and see the margin lost if you absorb the change. Free scope-creep calculator with a worked example.
- Calculator
Risk mitigation value calculator
Compare expected risk cost before and after mitigation. Find net expected benefit and the break-even mitigation spend without confusing averages with reserves.
- Calculator
Project capacity calculator
Compare required project effort with team capacity. Calculate an hours shortfall, minimum team size and resource-only duration from availability assumptions.
- Calculator
Project cash flow calculator
Model a deposit, three delivery phases and milestone payments. See the lowest cash balance and additional funding needed even on a profitable project.
- Calculator
Project contingency calculator
Calculate a contingency reserve above a named cost baseline at P50 to P99 using a clearly labeled PERT normal approximation. Free worked example.
- Guide
Agency project estimating: roles, reviews and cash
Estimate agency work with role-based costs, revision limits, specialist capacity and milestone cash flow. Includes a worked project and bid checklist.
- Guide
Bid review checklist: a defensible price and delivery decision
Review scope, cost assumptions, confidence, capacity, risks, cash flow and quote authority before bidding. Includes an interactive downloadable checklist.
- Guide
Consulting engagement estimating: discovery to handoff
Estimate consulting work with bounded discovery, interview effort, analysis, client reviews and a clear handoff. Includes pricing and risk examples.
- Guide
Freelance project pricing: from capacity to quote
Build a freelance fixed-price quote from billable capacity, delivery cost, a scope boundary and a target margin. Includes a worked example and review checklist.
- Guide
Project proposal checklist: scope, price and assumptions
Prepare a fixed-price proposal with deliverables, acceptance, exclusions, client dependencies, pricing assumptions and payment milestones. Download a local checklist.
- Guide
Software project estimating: effort, dependencies and risk
Build a software delivery estimate from tasks, three-point ranges, dependency chains, availability and discrete risks. Includes a concrete schedule example.
- Article
Fixed price vs time and materials: check the tail
The pricing model decides who carries the variance. A way to choose between fixed price, time and materials and hybrids by looking at the loss tail rather than the average.
- Article
Parallel tasks: each one on time is not enough
Five parallel tasks each 80% likely to finish by day 20 give a project only a 33% chance of finishing by day 20. Merge bias, worked out exactly.
- Article
What probability of loss is acceptable on a bid?
A 15% chance of losing money sounds fine until you bid ten jobs. Binomial math shows why the acceptable number depends on how many bets you make and how big the loss is.
- Article
Price a risk register, not its average
Four discrete risks add up to a $7,050 expected cost. The outcome is never $7,050. A worked example shows what to price instead of the average.
- Article
Rush fees: price the schedule, not the urgency
A rush plan has its own hours, helper cost and risk. Price the compressed schedule from those inputs, then test a flat surcharge against the cost floor.
- Article
Rate increases: how many hours can you lose?
A 15% rate rise can still leave an existing client worth more, even after it buys fewer hours. Two break-even tests show how far the hours can fall.
- Article
Three-point estimates: ranges before guesses
Narrow ranges look confident and price risk as if it were gone. A worked example shows how the pessimistic value, not the most likely one, moves your quote.
- Article
The 40 unbilled hours that turn a 25% project margin into 10%
Cost an incremental change, compare absorbing it with charging a fee, and keep the original project economics separate from the change margin.
- Article
Is a risk mitigation worth its cost? Compare the residual risk too
A 1,500 mitigation produces 1,300 net expected benefit in this worked example. See why that does not guarantee a saving or define a P80 reserve.
- Article
400 hours of work is not a delivery date
Separate effort, available capacity and dependency-driven duration with a three-person capacity check and a small parallel-task schedule.
- Article
Your freelance rate depends on billable hours, not working hours
A worked annual budget shows why 1,840 available hours can mean only 1,104 billable hours, and how utilization changes the required rate.
- Article
A 10% project discount can remove 40% of your profit
Follow a 20,000 quote through a requested discount, calculate the margin floor, and compare a price concession with an actual scope reduction.
- Article
A profitable project can still need cash before the next milestone
A 24,000 project earns 6,000 gross profit yet reaches a 2,400 funding gap. Follow the deposit, delivery costs and collections in order.
- Article
Cost rate versus billing rate: do not put the selling price into the cost model
An 80-hour example separates loaded delivery cost, client billing rate and target margin, and shows how an unnoticed second margin changes the quote.
- Article
A profitable bid can still be the wrong use of scarce capacity
Compare two illustrative projects with the same gross profit but different specialist-hour requirements, then check the constraints behind the ranking.
- Article
How many Monte Carlo iterations does a bid need?
A worked test: repeat one project simulation 200 times at four run counts and see how much P50, P80 and P95 move, and when more runs stop mattering.
- Article
Can you add task P80s? Why the sum overshoots
Eight task P80s add up to $58,551, but the project’s P80 is $51,765: that sum sits at P98.7. Why percentiles don’t add, and what correlation changes.
- Article
Pricing a change request on a fixed-price project
Two identical $7,200 changes: one barely moves the date, the other cuts on-time odds from 84% to 25%. A flowchart and the numbers for pricing a change.
- Article
How to price a late-delivery penalty into a quote
A $600-a-day delay clause added $3,063 to the quote that keeps 80% margin confidence. How to price the clause, and which negotiating lever moves it most.
- Article
Cone of uncertainty: how wide should a quote be?
A project’s final cost can land from a quarter to four times your first estimate. How the range narrows by stage, and what to quote at each one.
- Article
Pricing fixed-price work when AI makes you faster
A 35% speed-up on AI-assisted tasks is about a 25% cut in project cost. Cutting your price 35% drops the odds of a 25% margin from 80% to 28%.
- Article
Task dependencies: why adding durations gives the wrong deadline
A four-task example separates elapsed time, labor cost and shared resources before you estimate deadline confidence.
- Article
Project contingency: build a reserve without counting risk twice
Separate base uncertainty, discrete events and the pricing reserve with a worked $75,000 P80 project example.
- Article
On time and on budget: why two 80% chances are not one
A 1,000-scenario worked example shows how to count joint deadline and budget success, and why multiplying two headline probabilities can mislead.
- Article
Margin vs markup: price a fixed-price project correctly
A worked $60,000 cost example shows why a 25% markup gives a 20% margin, and how to apply your margin to a simulated cost percentile.
- Article
Client budget below your quote? Change the scope with numbers
A worked $80,000 budget example separates a discount from a scope change, with three options you can explain in a fixed-price negotiation.
- Article
Calibrate project estimates with completed jobs
Use a small forecast log to compare promised percentiles with actual outcomes, diagnose misses, and improve the next estimate without rewriting history.
- Article
PERT vs Monte Carlo: three-point estimates lie
PERT squeezes a whole range of outcomes into one average. Here is why that fails on a real 10-task project, and what to do instead.
- Article
P50 vs P80: choose the confidence behind your quote
P50 and P80 describe modeled cost coverage. A worked example separates margin confidence, loss probability and customer acceptance.
- Article
The fixed-price death spiral: one job eats three
An overrun costs more than the overrun: senior hours you cannot bill, deadlines you miss elsewhere, and the desperate next bid.
- Article
Deadline confidence: the number clients want
Clients do not want an earlier date. They want one they can plan around. Padding every task by 20% quietly costs you both — a worked example.
- Article
Your break-even is not a price — it is a clock
In fixed-price work, break-even moves every day the project runs. Same fee, nine extra days, and a healthy margin is a loss. Here is the math.
- Guide
P50 versus P80
Choose a confidence level and understand what cost percentiles mean.
- Template
Downloadable project estimate templates
Inspect example tasks, costs and risks for websites, integrations and advisory work.
- Reference
Project estimating glossary
Definitions, formulas and next steps for margin, contingency, percentiles and scheduling.
- Reference
Simulation methodology
How the Beta-PERT sampler, dependency model and reverse pricing work.
- Reference
BidVariance product documentation
Build, simulate, interpret and back up your first project.
No resources match. Try a shorter phrase or choose all types. Browse all calculators.